New Girl’s toilet block

Construction Started

The project has started and a 3 meter hole has been dug for the new toilets.

School’s situation

The school’s previous toilet facilities were showing their age and were not sufficient .

Fundraising in progress

Congratulations to Padstow School for raising £63.57 towards the toilet project.

Project costs

The costs for the project have been obtained. The total cost is 40,068 birr.

Cost details

The total cost is 40,068 birr, from which Link Ethiopia will contribute 77% (30,978 birr) and the local community 23% (9,090 birr).

Project update

The basement for the new toilet bock has been constructed and completed. The building has been divided into six cubicles. Blocks have been assembled and the wall is nearly finished. Roofing is the next job to be done.

Project Completed

Staff and pupils at Arbatu Ensesa Elementary School have been celebrating the opening of the new toilet block. Their previous toilet facilities were showing their age, and were not sufficient for the hundreds of pupils on site. The new toilet block contains six cubicles for female pupils and two for staff, and the old toilet block is now being used by male pupils.

Toilets in use

The new toilet is now properly used.